S. No. | Projects | Client |
---|---|---|
1. | Preliminary Design of Up grading Pakistan Railways’ Existing Mainline (MLL-1) and Establishment of a Dry Port near Havelian Description Complete detailed survey of tracks on Mainline-1 of Pakistan Railways, assisting and verifying layout plans of proposed underpasses/overhead bridges in replacement of level crossing in accordance with TORs, verifying Bill of Quantities (BOQs) and estimates and furnishing reasons for not providing underpasses/overhead bridge in replacement of level crossings and giving recommendations. | Pakistan Railways |
2. | Feasibility Study and transaction advisory services for transport of coal from Thar coal fields to Keti Bandar site through rail connectivity Description The project comprises feasibility study of a Jetty and Thar Coal based power plant at Keti Bandar including Railway link from Thar Coal fields to Keti Bandar power plant besides connecting this railway line to National Railway grid (ML-1). This study includes detailed topographic surveys of the sites, conducting hydrological and geotechnical studies and proposing a most economical and feasible rail route and its connecting to national railway grid of Pakistan Railways. In addition to that, study also includes legal, Environmental and Social Impact Assessment along with Transaction Advisory Services for the project. | Pakistan Railways |
3. | Consultancy Services to Carry Out Third Party Validation on CDA Projects. | Capital Development Authority (Islamabad) |
4. | Vetting of Design & Structural Drawing, in connection with construction of 1x 61’-0” (Skew Railway Span Flyover Bridge No. 17/A (On N-5 road 865+433) over the Railway Track at Km. 848/3-4 in replacement of L-Xing No.169/A & 169/B between LON-SHY- station on LON-KWL (via Chord) section. | Pakistan Railways |
5. | Vetting of Design, & Structural Drawings in connection with construction of Overhead Bridge (84’-7-1/2”) over the Railway Track at Km 1336/13-14 between Gujrat-Deona Juliani station on Lahore – Lala Musa section. | Pakistan Railways |
6. | Construction of (1×114’-10”) road over bridge at km. 452/1-2 between Tando Masti Khan – Khairpur stations on Tando Adam – Rohri section (General Layout plan) | Pakistan Railways |
7. | Vetting of Design in connection with construction of 02-nos 1×112’-6” (Skew) Railway Span Flyover Bridge No.342-a & 342-b over the Railway Track at Km. 81/5-6, 81/6-7 in replacement of level crossing no.50-A (Nadirabad Phattak Flyover no.02 & 01) between Sher Shah-Multan stations on LON-KWL (via loop) section. | Pakistan Railways |
8. | Design Vetting in connection with construction of Road over Bridge/flyover of Malir Express way (MEW) crossing the Railway Bridge no. 29 (25×60’-0”) at km.27/4 to 28/11 between Malir – Landhi stations on Karachi – Kotri section. | Pakistan Railways |
9. | Construction of New Track and Up-gradation/Rehabilitation of Track from Chaman Yard (Including) to Pak – Afghan Border. | Pakistan Railways |
S. No. | Projects | Client | |
---|---|---|---|
1. | Feasibility Study for up-gradation of railway infrastructure to facilitate Transportation of Copper Concentrate from Reko Diq (Baluchistan) to Bin Qasim Port, Karachi. 2008-09 | Tethyan Copper Company, Canada | ![]() |
2. | World Bank funded Project in association with M/s CPCS, Canada 1993. Stress testing of bridges. | Sudan Railways | |
3. | Track Maintenance Manual and Rules Book for Saudi Railways Organization 1982. Preparation of Railway Track Maintenance Manual of High Speed Track, Saudi Railways Organization, Saudi Arabia 2011-12. Wagon Riding Stability of SRO Fleet 2011-12. Project Management and Construction Supervision for Hofuf bypass Saudi Railways Organization 2011-15. Project management and supervision for sidings on ML2 Saudi Railway Organization 2011-13. | Saudi Railways Organization | ![]() |
4. | Feasibility Studies for Standard Gauge Railway System 2003. | Senegal Railways | |
5. | Studied the existing Railway System for identification of field Problems. | Syrian Railways | |
6. | Feasibility Study for provision of New Track from Chaman (Pakistan) to Kandhar (Afghanistan) 117 Kms. | Pakistan / Afghan Railway | ![]() |
S. No. | Projects | Client | |
---|---|---|---|
1. | Feasibility Study for up-gradation of railway infrastructure to facilitate Transportation of Copper Concentrate from Reko Diq (Baluchistan) to Bin Qasim Port, Karachi. 2008-09 | Tethyan Copper Company, Canada | ![]() |
2. | World Bank funded Project in association with M/s CPCS, Canada 1993. Stress testing of bridges. | Sudan Railways | |
3. | Track Maintenance Manual and Rules Book for Saudi Railways Organization 1982. Preparation of Railway Track Maintenance Manual of High Speed Track, Saudi Railways Organization, Saudi Arabia 2011-12. Wagon Riding Stability of SRO Fleet 2011-12. Project Management and Construction Supervision for Hofuf bypass Saudi Railways Organization 2011-15. Project management and supervision for sidings on ML2 Saudi Railway Organization 2011-13. | Saudi Railways Organization | ![]() |
4. | Feasibility Studies for Standard Gauge Railway System 2003. | Senegal Railways | |
5. | Studied the existing Railway System for identification of field Problems. | Syrian Railways | |
6. | Feasibility Study for provision of New Track from Chaman (Pakistan) to Kandhar (Afghanistan) 1a7 Kms. | Pakistan / Afghan Railway | ![]() |
Pakistan Railways Advisory & Consultancy Services
Railway Station Road, Rawalpindi
+92 51 9272 604
PR Burt Institute, Allama Iqbal Road, Lahore
Phone : +92 42 9920 5261
Fax : +92 42 3636 7459
I.I Chundrigar Road, Railway Station, Karachi City.
Phone : +92 21 9921 3796
Fax : +92 21 9921 3792
Copyright © 2023 PRACS Ltd. All right reserved.